TABLE
OF CONTENTS
CHAPTER En 500 RULES FOR GAS SERVICE
PART En 501 APPLICATION OF RULES
Section En 501.01 Application of Rules
Section En 501.02 Purpose
PART En 502 DEFINITIONS
Section En 502.01 Check Flow
Section En 502.02 Commission
Section En 502.03 Cubic Foot
Section En 502.04 Customer
Section En 502.05 Department
Section En 502.06 Economic Conservation
Section En 502.07 Fast
Section En 502.08 Gas
Section En 502.09 Incident
Section En 502.10 Jurisdictional LPG System
Section En 502.11 Landfill
Section En 502.12 Landfill Gas
Section En 502.13 Landfill Gas Operator
Section En 502.14 LNG
Section En 502.15 LPG
Section En 502.16 LPG Operator
Section En 502.17 Master Meter System
Section En 502.18 Meter
Section En 502.19 Open Flow
Section En 502.20 Peak Shaving
Section En 502.21 Person
Section En 502.22 Public Place
Section En 502.23 Slow
Section En 502.24 Standard Gravitational Force
Section En 502.25 Total Heating Value
Section En 502.26 Turbine Meter
Section En 502.27 Utility
PART En 503 SERVICE PROVISIONS
Section En 503.01 Measurement of Services
Section En 503.02 Meter Reading
Section En 503.03 Change in Character of Service
Section En 503.04 Customer Relations
PART
En 504 QUALITY OF GAS SERVICE
Section
En 504.01 Heating Value Requirements
Section
En 504.02 Purity Requirements
Section
En 504.03 Pressure Requirements
Section
En 504.04 Interruptions of Service
Section
En 504.05 Emergency Notification
Section
En 504.06 Incident Reporting
Section
En 504.07 Emergency Response
PART
En 505 METER INSTALLATION, ACCURACY AND
TESTING
Section
En 505.01 Meter Installations
Section
En 505.02 Inspection of Meters
Section
En 505.03 Test and Calibration of Meters
Section
En 505.04 Test Schedule for Gas Meters
Section
En 505.05 Customer Requested Tests
Section
En 505.06 Customer Bill Adjustments
Section
En 505.07 Testing Facilities and Equipment
PART
En 506 EQUIPMENT AND FACILITIES
Section
En 506.01 Pipeline Safety Standards
Section
En 506.02 Construction, Operations and
Maintenance
Section
En 506.03 On-site Storage
PART
En 507 RECORDS AND REPORTS
Section
En 507.01 Records in General
Section
En 507.02 Station Records
Section
En 507.03 Gas Supply Measurement
Section
En 507.04 System Maps
Section
En 507.05 Meter Records
Section
En 507.06 Reports to Department
PART
En 508 SAFETY, ACCIDENT AND LEAKAGE
REQUIREMENTS
Section
En 508.01 Safety Practices
Section
En 508.02 Resuscitation
Section
En 508.03 Accidents
Section
En 508.04 Leakage Surveys and
Inspections
Section
En 508.05 Leakage Record-Keeping and
Reporting
PART
En 509 FORMS REQUIRED TO BE FILED
Section
En 509.01 F-1G Rate of Return
Section
En 509.02 F-16G Annual Report for Gas
Utilities
Section
En 509.03 F-8G Monthly Operating and Income
Statements
Section
En 509.04 F-22 Information Sheet
Section
En 509.05 E-5G Utility Accident Report
Section
En 509.06 E-6 Heating Value and Purity
Report
Section
En 509.07 E-7 Annual Report of Gas Meter
Tests
Section
En 509.08 E-8 Report of Pressure Complaints
Section
En 509.09 E-23 Report of Interruptions
of Service
Section
En 509.10 E-24 Report of Gas Meter Complaint
Tests
Section
En 509.11 E-35 Status of Leaks
Section
En 509.12 E-27 Annual Peak Shaving Fuel
Storage Capability Report
Section
En 509.13 E-28 Weekly Gas Storage Report
Section
En 509.14 E-29 Weekly Portable LNG
Vaporizer Activity Report
Section
En 509.15 E-30 Summary of Peak Day
Report
Section
En 509.16 E-31 Forecast of Upcoming
Winter Period Design Day Report
Section
En 509.17 Federal Reports Filed with
Department
Section
En 509.18 E-32 Monthly Customer
Migration Report
PART
En 510 ENFORCEMENT PROCEDURES FOR GAS
PIPELINE UTILITIES
Section
En 510.01 Jurisdiction Scope and Application
of Authority
Section
En 510.02 Intervals of Inspection
Section
En 510.03 Inspection of Utilities
Section
En 510.04 Verbal Notice to Utility of
Probable Violation
Section
En 510.05 Written Formal Notice of
Probable Violation
Section
En 510.06 Responses to Notice of Probable
Violation
Section
En 510.07 Informal Conferences
Section
En 510.08 Notice of Violation
Section
En 510.09 Response to Notice of
Violation
Section
En 510.10 Department Action
PART
En 511 LP AND LANDFILL GAS PIPELINE
SAFETY STANDARDS
Section
En 511.01 Compliance with Federal
Standards Required
Section
En 511.02 Compliance with Other
Standards
Section
En 511.03 E-27-A Jurisdictional LP Gas
Facilities Report
Section
En 511.04 Confidential Records
Section
En 511.05 Emergency Notification
Section
En 511.06 Incident Reporting
Section
En 511.07 Accidents
Section
En 511.08 Construction and Maintenance
Section
En 511.09 Underground Utility Damage
Prevention Program
Section
En 511.10 Marking of Containers
Section
En 511.11 System Maps
Section
En 511.12 Procedure for Reporting
Emergencies
Section
En 511.13 Preservation of Records
Section
En 511.14 Leakage Surveys and
Inspections
Section
En 511.15 Leakage Record-Keeping and
Reporting
Section
En 511.16 E-5G LPG Operator or Landfill Gas
Operator Accident Report
PART
En 512 ENFORCEMENT PROCEDURES FOR LP AND
LANDFILL GAS OPERATORS
Section
En 512.01 Jurisdiction Scope and
Application of Authority
Section
En 512.02 Intervals of Inspection
Section
En 512.03 Inspection of LPG and Landfill
Gas Operators
Section En 512.04 Verbal Notice to LPG Operator or Landfill Gas
Operator of Probable Violation
Section
En 512.05 Written Formal Notice of Probable
Violation
Section
En 512.06 Responses to Notice of
Probable Violation
Section
En 512.07 Informal Conferences
Section
En 512.08 Notice of Violation
Section
En 512.09 Response to Notice of
Violation
Section
En 512.10 Department Action
CHAPTER En 1300 UTILITY POLE
ATTACHMENTS
PART En 1301 PURPOSE, APPICABILITY, AND SCOPE
Section En 1301.01 Purpose
Section En 1301.02 Applicability
PART Eng1302 DEFINITIONS
Section En 1302.01 Attaching Entity
Section En 1302.02 Boxing
Section En 1302.03 Commission
Section En 1302.04 Communications Space
Section En 1302.05 Complex Make-Ready
Section En 1302.06 Excepted Local Exchange Carrier
Section En 1302.07 Extension Arm(s)
Section En 1302.08 Facility
Section En 1302.09 Federal Communications Commission (FCC)
Section En 1302.10 Make-Ready Work
Section En 1302.11 New
Attaching Entity
Section En 1302.12 Overlash
Section En 1302.13 Pole
Section En 1302.14 Simple Make-Ready
Section En 1302.15 Usable Space
Section En 1302.16 Utility
PART En 1303 ACCESS TO POLES
Section En 1303.01 Access Standard
Section En 1303.02 Owner Obligation to Negotiate
Section En 1303.03 Requestor Obligation to Negotiate
Section En 1303.04 Request for Access and Response Requirements
Section En 1303.05 Authorization Required
Section En 1303.06 Notification
Section En 1303.07 Installation and Maintenance
Section En 1303.08 Labeling of Attachments
Section En 1303.09 Location of Attachments
Section En 1303.10 Boxing of Poles
Section En 1303.11 Use of Extension Arms
Section En 1303.12 Make-Ready Work Timelines
Section En 1303.13 One-Touch Make-Ready Option
CHAPTER En
1400 RULES FOR PIPELINE PUBLIC
UTILITIES
PART En 1401 DEFINITIONS
Section En 1401.01 Pipeline Public Utility
Section En 1401.02 Department
PART En 1402 REPORTING REQUIRMENTS
Section En 1402.01 Reports to Department
PART En 1403 FORMS TO BE FILED
Section En 1403.01 F-22 Information Sheet
Section En 1403.02 Annual Reporting